State what the handoff is ready for
Begin with the property, the purpose of the request, and the scope of the work completed. Identify the search period and the sources actually used. State whether the package contains gathered records, an extracted abstract, reviewed findings, or a combination. The examiner needs that context before interpreting the summary.
TITL describes a workflow that carries county records into ownership history, abstracted details, and source-linked findings for commitment preparation. This guide illustrates how a team can organize that handoff. It does not describe an issued commitment or assume that software has made the examiner’s decisions.
Give each finding a route to the original record
Pair the finding with the instrument reference and the relevant source page or range. Include the complete source document where it is available, so the examiner can inspect surrounding language and exhibits. A citation that leads only to a filename is less useful when that file contains several instruments.
Separate the recorded observation from the proposed interpretation. “The assignment refers to instrument 4182” is a checkable observation in a fictional example. Whether that assignment establishes the relationship needed for the transaction is a question for examination. Put the observation and the review question next to each other.
Organize the history and interests without filling gaps
Arrange the located documents in a sequence the examiner can follow. Show the references supporting connections between deeds and related instruments. For mortgages, assignments, or releases, preserve the specific earlier recording each document identifies. If the connection relies only on a similar name, label it as unconfirmed.
Keep property-description differences visible. A summary should retain the source of each description and identify the comparison that remains to be made. Do the same for conflicting dates or party spellings. A smooth narrative is less useful than a precise question attached to the records that prompted it.
Write an open-item list with a next action
Each unresolved item should name the missing evidence or decision, explain why it affects the handoff, and identify who takes the next step. “Need missing Exhibit A to compare the property description” gives the next person a concrete task. “Check property” sends them back to the beginning.
The following is a suggested completeness check for the package. It can be maintained in your team’s existing process; it does not imply a TITL approval screen or an automatic exception decision.
- Scope: include requested and completed work, source limits, and the relevant cutoff.
- Sources: retain complete PDFs and trace important fields to their pages.
- History: distinguish supported connections from candidates and missing links.
- Interests: identify the instruments reviewed and the relationships still needing examination.
- Ownership of work: assign missing documents, factual checks, and examiner decisions separately.
| Evidence or gap | Action | Responsible role |
|---|---|---|
| Release p. 1 refers to 2018-0048; supplied mortgage is 2018-0046 | Obtain the referenced instrument and retain both numbers | Researcher |
| Deed refers to Exhibit A; copy omits the exhibit | Request the complete recorded instrument | Source-collection owner |
| Two source descriptions are available | Evaluate their relationship to the requested land and interest | Examiner |
| A commitment requirement cites a missing record | Ask the issuing title company what evidence it requires | Assigned transaction contact |
Keep preparation and approval distinct
Before the handoff, check that the examiner can locate every cited record and understand each remaining question without reconstructing the research. State which factual checks have been completed and which are pending. If a needed source is unavailable, keep the request and its status with the file.
The resulting package supports examination and subsequent commitment preparation by the responsible team. Record that team’s decisions through its established process. Preparation is complete when the agreed materials and open items are delivered clearly; approval belongs to the person or process authorized to provide it.
The fictional abstract example provides the source observations behind the first open item. The document comparison explains why this research package and an insurance commitment serve different purposes.
Sources & further reading
General educational information, not a title opinion, insurance commitment, or legal advice. Questions about a particular property or transaction should be reviewed by an appropriate title professional or attorney.